- Home
- Work
- Planning & Development
- Development Proposals Under Review
- 16 & 18 Mill Street, Georgetown
16 & 18 Mill Street, Georgetown Development Proposal
- Building & Engineering
- Business
-
Planning & Development
- Development Application Information & Resources
-
Development Proposals Under Review
- 1 Rosetta Street, 6 & 8 Saint Michaels Street, Georgetown
- 16 & 18 Mill Street, Georgetown
- 37 King Street, Georgetown (Exchange Hotel)
- 97 Bower Street, Acton
- 130 Mountainview Road North, Georgetown
- 159 Confederation Street, Glen Williams
- 530 Guelph Street, Norval
- 14015 Danby Road, Norval United Church Apartment Building
- 16469 10 Side Road, Southeast Georgetown
- Eden Oak, McMaster Street & Meagan Drive
- Planning Policy
- Urban Boundary Expansion Proposals
- Procurement & Risk
- Zoning
In December 2020, AGK Multi-Res GP Ltd. submitted Official Plan Amendment and Zoning By-law Amendment applications (File Nos. D09OPA20.005 and D14ZBA20.014) for 16 and 18 Mill Street in Georgetown. The applications were to permit the development of a 6-storey, 52-unit residential apartment building.
In May 2022, the applications were revised to respond to concerns raised by the public regarding building height, density, traffic, parking, etc. The revised proposal includes two 4-storey residential buildings containing a total of 34 units for the entire site.
This page has been created to provide periodic project updates to members of the public. Please consult this webpage regularly for updates.
Application Description
The proposed Official Plan Amendment would redesignate the site from Medium Density Residential Area and Greenlands to Medium Density Residential Area with a special policy to increase the maximum permitted density. The Zoning By-law Amendment would change the zoning of the site from Low Density Residential One (LDR1-2) and Environmental Protection One (EP1) to Medium Density Residential Two (MDR2) with special provisions.
Project Status
- Applications filed in December 2020
- Statutory Public Meeting held on March 22, 2021 at 6 p.m. (view the Public Meeting Presentation). A staff presentation was provided by John McMulkin, Senior Planner – Development Review, followed by comments from the applicant's Planning consultant and interested members of the public
- Applications revised in May 2022 to respond to concerns raised by the public
- 3rd submission provided in October 2024 for review
- 4th submission provided in November 2024 for review
4th Submission (November 2024)
Files temporarily unavailable
These files are temporarily unavailable while we migrate content to a new website platform. We are working to make all information available as soon as possible. Please check back soon, and thank you for your patience. If you require assistance accessing information in the meantime, please contact the staff member listed at the top of this page.
- Architectural Drawings
- CN Memo - Noise Report
- Comment Response Matrix
- Composite Utility Plan
- CVC Memo - Natural Hazards
- Design Renderings
- Draft ZBA
- Engineering Notes and Detail Drawing
- Environmental Noise Assessment
- Erosion and Sediment Control Plan
- Functional Servicing Report
- Grading Plan
- Landscape Notes
- Landscape Plan
- Phase II ESA
- Photometric Plan
- Reliance Letter - A A Environmental
- Reliance Letter - Cotyledon
- Reliance Letter - Egmond
- Reliance Letter - Watters Environmental
- Response Letter - Groundwater and Dewatering
- Risk Management Plan
- Salt Management Plan
- Site Servicing Plan
- Source Water Protection Memo
- Stormwater Management Report
- TIPP Figure
- TIPP Report
- Transportation Impact and Parking Justification Study
- Water Usage and Sanitary Discharge Report
3rd Submission (October 2024)
Files temporarily unavailable
These files are temporarily unavailable while we migrate content to a new website platform. We are working to make all information available as soon as possible. Please check back soon, and thank you for your patience. If you require assistance accessing information in the meantime, please contact the staff member listed at the top of this page.
- Architectural Drawings
- Cover Letter
- Dewatering Memo
- EIA Report
- Electrical Design
- ENG Notes and Details
- Environmental Noise Assessment
- ESC Plan
- FSR Sanitary Addendum
- FSR
- Gas Design
- Grading & Drainage Plan
- Hydrant Flow Test
- Landscape Plan Details
- Landscape Plan
- OPA Text
- Phase 1 ESA
- Photometrics Plan
- Planning Justification Report
- Response Letter to Region
- Response Letter to CVC
- Response Letter to Town (ENG)
- Response Letter to Town
- Site Servicing Plan
- TIPP Details
- TIPP Plan
- Topographic Survey
- Traffic Impact Study
- ZBA Text
2nd Submission (June 2023)
Files temporarily unavailable
These files are temporarily unavailable while we migrate content to a new website platform. We are working to make all information available as soon as possible. Please check back soon, and thank you for your patience. If you require assistance accessing information in the meantime, please contact the staff member listed at the top of this page.
- Comment Response Letter
- Conceptual Design Renderings
- Cover Letter
- Draft Official Plan Amendment
- Draft Zoning By-law Amendment
- Elevations
- Erosion and Sediment Control Plan
- Functional Servicing Report
- Grading and Drainage Plan
- OBC Matrix
- Planning Justification Report
- Reference Plan
- Shadow Study
- Site Plan
- Site Servicing Plan
- Tree Inventory and Preservation Plan Report
- Tree Inventory and Preservation Plan
- Urban Design Brief
1st Submission (July 2022)
Files temporarily unavailable
These files are temporarily unavailable while we migrate content to a new website platform. We are working to make all information available as soon as possible. Please check back soon, and thank you for your patience. If you require assistance accessing information in the meantime, please contact the staff member listed at the top of this page.
Air Quality Study
Commemoration and Interpretation Plan
Design of Crash Wall
Draft Official Plan Amendment
Draft Zoning By-law Amendment
Environmental Noise and Vibration Study
Environmental Site Screening Questionnaire
Functional Servicing and Stormwater Management Report
Geotechnical Investigation
Heritage Impact Assessment
Phase 1 Environmental Site Assessment
Phase 2 Environmental Site Assessment
Planning Justification Report
Renderings
Section 59 Notice
Shadow Study
Site Grading Plan
Site Plan, Floor Plans and Building Elevations
Site Servicing Plan
Survey
Transportation Impact and Parking Study
Tree Inventory and Protection Plan Report
Tree Inventory Protection Plan
Urban Design Guidelines
Water Balance Assessment and Salt Management Plan