The official website for the Town of Halton Hills Ontario Canada. Halton Hills includes Georgetown, Acton, Stewarttown, Glenwilliams, Norval, Hornby, Limehouse, and Terra Cotta. Get Municipal News, By-law Information, Sustainability Tips, Recreation Swimming/Skating Schedules and everything else you would need to know about living, visiting, doing business in Halton Hills Ontario.

My Favourites

     

    How to Use the Favourites Menu
     
     

    Construction Projects

    Investing to Renew and Improve Halton Hills.Roads logo
    Keeping Our Roads Safe, in Top Condition, and managed fiscally.
    Road Construction projects improve residents’ quality of life for years to come.

    Each year, the Engineering Division provides both Pavement Management and Capital Works construction programs which renews and improves infrastructure across Halton Hills.

    The ROADS 2017 maps show the works that will be completed this year.  These maps provide a visual representation of each construction project location with details of anticipated start and end dates, description of works, and departmental contact information.

     

    Background

    Since 2013, the Engineering Division of the Planning and Infrastructure Department focused on communicating our Pavement Management Program and upgrading the roads in the various Ward areas to ensure that they were safe and in top condition for residents.

    Starting in the Spring of 2017, select streets will again benefit from road resurfacing and road construction.  Concurrent with the Town’s work, Halton Region, through the Building a Better Halton program will be completing water and wastewater capital projects on the streets indicated.

     

    Pavement Management Street Listing:

    Street/Road Span Type of Work Year
    Terry Court Resurfacing 2016
    Rexway Drive from Guelph Street to Delrex Boulevard Resurfacing 2016
    Gibbons Place Reconstruction 2016
    Delma Court Resurfacing 2016
    Crombie Place Resurfacing 2016
    Heslop Court Resurfacing 2016
    McIntyre Crescent Resurfacing 2016
    Garnet Drive Resurfacing 2016
    Dale Gate Resurfacing 2016
    Norton Crescent Resurfacing 2016
    Rexway Drive from Heslop Court to Delrex Boulevard Resurfacing 2016
    Elmore Drive from 80m South of Elizabeth Drive to Lakeview Avenue Resurfacing 2017
    Elizabeth Drive from Main Street North to Elmore Drive Resurfacing 2017
    Credit Street from Erin Street to Confederation Street Resurfacing 2017
    Tyler Avenue from Elmore Drive to Elizabeth Drive Resurfacing 2017
    Tidey Avenue from Elmore Drive to Elizabeth Drive Resurfacing 2017
    Burbank Street from Elmore Drive to End Resurfacing 2017
    Karen Drive Resurfacing 2017
    Mullen Place Resurfacing 2017
    Erin Street from Credit Street to Alexander Street Resurfacing 2017
    Beaver Street from Alexander Street to Credit Street Resurfacing 2017

     

    Capital Works Street Listing:

    Street/Road Span Type of Work Description Year
    15 Side Road between Fifth Line and Sixth Line Replacement Culvert Replacement 15232 - Engineering 2017, Construction 2020 2016
    Tenth Line between 27 Side Road and 32 Side Road Rehabilitation Slope Stability - Engineering/Permits 2016
    Tenth Line - North of 22 Side Road, Lot 23 Bridge Rehabilitation Bridge Rehabilitation 2016
    Main Street North and Ontario Street Intersection (Main Street North from Ontario Street, 75m South) Construction Right Turn Lane Construction and Road Resurfacing 2016
    Churchill Road North from Queen Street to the Urban Limit Resurfacing Road Resurfacing 2016
    Mill Street West Birchway Place to Cobblehill Road Resurfacing Resurfacing 2016
    Fourth Line from Highway 7 to 32 Side Road Resurfacing Surface Treatment 2016
    Fallbrook Trail from Clayhill Road to 13260 Fallbrook Trail Resurfacing Surface Treatment 2016
    17 Side Road between Fourth Line and Fifth Line Rehabilitation Culvert Rehabilitation - 24/C 2016
    15 Side Road between Fourth Line and Fifth Line Replacement Structure 15234 Replacement(Engineering 2017) 2017
    Fallbrook Trail from 27 Side Road to 13260 Fallbrook Trail Resurfacing Gravel Resurfacing 2017
    Eighth Line from 27 Side Road, 770m South Resurfacing Gravel Resurfacing 2017
    Tenth Line between 27 Side Road and 32 Side Road (500m Northwest of 27 Side Road and 1.25km toward 32 Side Road) Resurfacing Gravel Resurfacing 2017
    Mountainview Road North between King Street and Stewart MacLaren Road Rehabilitation Bridge 13207 over CNR, Engineering 2017
    5 Side Road from Fifth Line to Trafalgar Road Resurfacing 5 Side Road Minor Resurfacing 2017
    Fifth Line between 10 Side Road and 15 Side Road Replacement Structure 33/C Replacement 2017
    Dublin Line from Highway 7 to 32 Side Road Resurfacing Surface Treatment 2017
    Eighth Line from 27 Side Road to 32 Side Road Resurfacing Surface Treatment 2017
    32 Side Road from Trafalgar Road to Third Line Resurfacing Surface Treatment 2017
    Armstrong Avenue Phase 1 from Mountainview Road to Sinclair Avenue Reconstruction Reconstruction 2017
    Fifth Line between Steeles Avenue and 5 Side Road Replacement Culvert 37/C 2017
    Sinclair Avenue from Armstrong Avenue to Guelph Street Construction Multi-Use Path 2017
    Main Street North (Highway 7) from Knox Street 500m North Resurfacing Roadway Resurfacing and Structure 37 Minor Repairs 2017

    You can expect some disruption during this work. However, we believe that the improvements to neighbourhood road safety and road condition will compensate for this short-term construction work period.

     

    Contact Us First!

    To Help you find the information that you are looking for, please refer to our Frequently Asked Questions before you Contact Us!
               
    Our Frequently Asked Questions are separated into topics to help you find answers faster.

    We have set up a response plan to address any questions or concerns that you may have.  To help track and address your concerns, please follow the steps below:

    Identify Concern – To help us track the issue, please tell us if the concern is regarding:

    • Business Loss
    • Contractor Work
    • Damage, Property
    • Damage, Vehicle
    • Drainage
    • Driveway
    • Dust
    • Mud
    • Noise
    • Region, Wastewater
    • Region, Water
    • Timing
    • Utility Break
    • Vibration

    Contact Us:

    The Town of Halton Hills will facilitate issue resolution and contact the on-site inspectors, as required. Please contact the following with respect to your concerns:

    Teri Hoey
    Supervisor of Construction
    Town of Halton Hills
    1 Halton Hills Drive
    Halton Hills ON L7G 5G2
    Email: Teri Hoey
    Phone: 905-873-2601 ext. 2309

     

    Michelle Mathies
    Project Mgr, Municipal Infrast
    Town of Halton Hills
    1 Halton Hills Drive
    Halton Hills ON L7G 5G2
    Email: Michelle Mathies
    Phone: 905-873-2601 ext. 2319

     

     

    Dick Spear
    Superintendent of Public Works
    Town of Halton Hills
    1 Halton Hills Drive
    Halton Hills ON L7G 5G2
    Email: Dick Spear
    Phone: 905-873-2601 ext. 2612

     

     

     

    Adjusting Your Driving Routes

    Please take note of these construction project locations in order to adjust your driving route and time

     

    Possible Project Delays

    ROADS 2017 could be delayed by inclement weather or other site conditions identified during construction.  Please check back to this website for any updates. Letters will be circulated regarding project delays.

     

    Widening your Curb Depression

    If you want to widen your curb depression for your driveway apron, you need to follow the Town’s application guidelines.  This process requires some lead time. Road Cut Changes (Entrance Permit).

    Please contact the Town's project contact to determine if a widening is possible.

     

     


    Send a message to
    *You will be copied on this email.